من أنا
المقالات
الوظائف
التواصل معي

Defining the need and the specification

Most buying problems are not born at the negotiating table but in the first line of the request. A vague specification produces a vague offer and a wrong delivery — and then the supplier gets the blame.

Chapter 1 · Lesson 2 of 510 min readBeginner level

The purchase requisition is the document that turns a need in someone’s head into a financial commitment for the business. Which is why it must answer four questions before it leaves the department: what? how much? when? and why?

1 From a need to a requisition

1
The need

Stock run down, a project, a replacement

2
The check

Is there an alternative already in the store?

3
The request

A requisition with specification, quantity and date

4
Approval

Financial authority according to value

Step two is the cheapest in the whole cycle and the most often skipped

Requisition fieldWhy it matters
Item description and codePrevents buying an incompatible substitute
Quantity and unit of measureConfusing a carton with a piece multiplies the order many times over
Date requiredDecides whether we buy at normal or expedited prices
Cost centreCharges the expense to the right place
Reason for the requestAllows the need itself to be discussed, not just the item
ApproverEvidences that the commitment was authorised

Unit of measure: a silent, costly error

A request for “100 cartons” against a system unit of “piece” delivers 100 pieces instead of 2,400. Or the reverse, and the store fills with two years of stock. The unit of measure is fixed once in the item master, never left to whoever types the request.

2 Types of specification

TypeHow it is writtenIts strengthIts weakness
By brand “Brand X, model Y” Fast and precise Kills competition and raises the price
By technical characteristics Dimensions, materials, capacities Allows equivalent alternatives Takes expertise to write
By performance “Lifts 2 tonnes to 6 metres” Opens the door to better solutions Needs clear acceptance criteria
By reference standard Compliant with a recognised standard Objective and provable A standard may not exist for the item

“Or equivalent”

If you must name a brand for clarity, always follow it with “or equivalent” and state the criteria of equivalence: which characteristics must an alternative match to be accepted? Without that you have awarded the order before you asked for a single quotation.

3 A specification written around a supplier

A competition of three offers, in form only

Three quotations were sought for a device, and the specification required: an exact length in millimetres, a particular casing colour, operating software named by brand, and a supplier with 15 years of experience “in this exact model”.

Offers received3
Offers technically compliant1
Savings from competition0

Result: a procedurally clean process with no competition in it at all. And the clearest indicator is this: how many offers passed the technical evaluation? If the answer is always one, the specification is the problem, not the market.

4 Consolidating demand

  • Scattered buying is expensive: ten small requests cost ten transactions and forfeit volume discounts.
  • A framework agreement: a price agreed for a year, drawn down with release orders.
  • An annual purchasing plan gathers departmental needs in advance and turns them into one negotiation.
  • Expedited buying carries a premium, so measure its share of total orders; a rising share means weak planning, not bad luck.
  • A minimum order threshold prevents issuing a purchase order worth less than the cost of issuing it.

Lesson summary

  • A requisition answers what, how much, when and why, and is approved with authority.
  • The unit of measure lives in the item master, not in the mind of whoever raises the request.
  • There are four types of specification, and the most dangerous is a brand with no “or equivalent”.
  • The number of technically compliant offers reveals whether competition is real.
  • Consolidating demand lowers the price and the transaction cost together.
  • The share of expedited buying measures planning quality, not market conditions.

5 Test your understanding

Three quick questions

Pick the answer you believe is correct and you will see the result immediately.

1. In every competition only one offer passes the technical evaluation. The most likely conclusion:

2. “100 cartons” was requested while the system unit for the item is “piece”. The expected result:

3. A department raises ten small requests a month for the same item. The best fix:

Sources and review: the concepts of the purchase requisition, types of specification and demand consolidation as settled in purchasing literature. The examples and figures are illustrative. Last reviewed: September 2026.